Moskva, Moscow, Russian Federation
In recent years, there has been an increased interest in the application of probabilistic methods, in particular. the theory of queuing, to the evaluation of the effectiveness of the activities of management companies in the organization of the operation of technical systems of residential buildings. The article considers the M|G|1 service system with the possibility of breaks in the work of repair teams for basic requirements, when, for example, repair teams work on third-party orders. The optimization problem is solved from the point of view of the cost criterion. As controlled factors, the probability of a break α and its duration are proposed. Under fairly general assumptions about the behavior of the system at breaks, it is established that the optimal value of the probability α is either zero or one. Necessary and sufficient conditions are given under which a break should be implemented, i.e. α=1. With a constant duration of breaks, the conditions are determined under which α=1, and the duration of the break is optimal.
queueing system, scheduled prophylactic inspection, residential building, vacation
1. Y. Levy and U. Yediial. Utilization of idle time in an M/G/1 queuing system. Management Science, 22, 209-211, 1975.
2. B.T. Doshi. Queueing systems with vacations - a survey. Queueing Syst., 1:1, 29-66, 1986.
3. V.T. Doshi. Single-server queues with vacations, Stochastic analysis of computer and communications systems, Noth-Holland, Amsterdam, 217-265, 1990.
4. H. Takagi. Queueing Analysis: A Foundation of Performance Analysis. Vol.1: Vacation and Priority Systems, Part 1, North-Holland Publishing Co. Amsterdam, 1997.
5. N. Tain and Z. G. Zhang. Vacation Queueing Models: Theory and Applications, In tern at. Ser. Op er. Res. management Sd. 93, Springer, New York, 2006.
6. L.D. Servi and S.G. Finn. M/M/l queue with working vacations (A/|A|l|WV), Performance Evaluation, 50:1, 41-52, 2002.
7. G.A. Afanas'ev. Sistema ;W|G|1 S pereryvami v rabote pribora i ih zaderzhkami. Teoriya veroyatn. i ee primen., 66:1, 3-19, 2021.
8. J. Li and N. Tian. The M/M/1 queue with working vacations and vacation interruption, J. Syst. Sd. Syst. Eng., 16, 121-127, 2007.
9. J. Li, N. Tian, Z. Ma. Performance analysis of G1|A/|1 queue with working vacations and vacation interruptions, Appl. Math. Model., 32:12, 2715-2730, 2008.
10. M. Zhang, Z. Hou. Performance analysis of queue with working vacations and vacation interruptions, J. Coinput. Appl. Math., 234:10, 2977- 2985, 2010.
11. C. Srernivasang, S. R. Chadiavarthy, A. Krishnamoorthy. MAR/RYa/1 queue with working vacations, vacation interruptions and Ar-policy, Appl. Math. Model., 37:6, 3879-3893, 2013.
12. O.C. Ibe, O.A. Isiola. L/|L/|1 multiple vacation queueing systems with differential vacations, Model. Simul. Eng., 158247, 2014.
13. O.C.Ibe. A/|G|1 vacation queueing system with server timeout . Amer. S. Oper. Res., 5:2, 77-88, 2015.
14. B.V. Gnedenko, I.H. Kovalenko. Vvedenie v teoriyu massovoyu obsluzhivaniya, Izd. 3-e, Moskva, KomKniga, 2005.
15. D.R. Koks, V.L. Smit. Teoriya vosstanovleniya, Moskva, "Sovetskoe radio 1967.